Thank you for your patience while we retrieve your images.


Thumbnails
 
_MBP6116

_MBP6116

Digging site for GLB placement. Conduit was placed 2 months earlier and then buried with a locator ball. A pit will be excavated first by machine, then by shovel. Once the pit is open the GLB to be placed over the exposed conduit.